Mushroom tunnel 8x30m
Due to market volatility, the displayed price will be confirmed by phone or email.
Our high tunnels for mushrooms are created based on several successful projects and optimized for the cultivation of oyster mushrooms with a maximum load of 23 tons of compost.
-
Grow room
Dimensions: Width: 8m; Length: 30m; Area: 240sqm; Ridge height: 3.30m; Gutter height: 2.35m.
Structure: E260 type galvanized steel, with a 60mm diameter pillars and arches. The arches and pillars are latticed and are placed every 1,5m.
Roof and sides coverage and thermal insulation: white/green 250 microns three-layered 250 microns film on the exterior, 20cm glass wool layer between the films, transparent 200 microns film on the interior.
Gable coverage and thermal insulation: 80mm sandwich panels. The corners are secured using aluminum corner guards.
Access areas: 3 access doors (0,9mx2,0m) insulated with polyurethane panels. The doors are positioned longitudinal.
-
Technical space – used to safekeep the electric and electronic equipment or as a storage space for the picked mushrooms.
Dimensions: Width: 8m; Length: 3m; Area: 24sqm; Ridge height: 3.30m; Gutter height: 2.35m.
The structure and the roof, sides and gable coverage and thermal insulation are identical to those of the grow room.
-
Shelves for mushroom cultivation
- • Metal shelves with galvanized steel frame E260 Sendzimir;
• Legs and cross elements (40x40mm); CORs – 5 lines/level;
• Dimensions: Side shelf L * w * h = 28.5x0.9x1.8m, 2 shelves - 2 pieces of 51.3sqm each; Central shelf L * w * h = 28.5x0.9x2.4m, 3 shelves - 2 pieces of 76.95sqm each;
• Longitudinal shelf placement, shelf-shelf and shelf-wall distance: 88 cm.
-
Auxiliary systems, installations, and equipment
A. Technological climate control equipment
- • LINE.P programmable control panel (designed for the command and control of the parameters in the mushroom cultivation chamber, by programming the parameters on the technological phases of cultivation
• CO2.LIN single CO2 sensor (designed for the measurement and determination of the CO2 concentration)
• UTA.P20 air treatment unit (it is a complex unit, sized for air treatment in the grow area)
• MAD.P20 air intake/distribution technological module (it is a prefabricated modular equipment that ensures the intake of air from outside, recirculates the air from the cultivation chamber and distributes the mixed air into the cultivation chamber)
• GE.2 exhaust group
• PEV.20 evaporation filter panel
• GRPE.1 water cooling unit evaporation filter
B. Auxiliary equipment and technological installations
- • Chiller 28 Kw (designed to obtain cold water at a temperature of 6ºC/12ºC, round-trip, necessary in adjusting the technological parameters)
• Thermal installation - technological cooling (includes the round-trip technological cold water circuit, from the chiller to the air treatment unit)
• 18 Kw thermal heater (designed to obtain technological hot water 60ºC/85 ºC for a cultivation chamber)
• Thermal installation - technological heating (includes the round-trip technological hot water circuit)
• Power unit (all electrical installations made from the general switchboard in the built perimeter)
• Electrical unit for interior lighting (all electrical installations made in the culture chamber)
C. Technological assembly of equipment (A+B)
The price does not include the following:
- installation of the structure, pouring of the foundations or floors
- the concrete needed for bearings or floors
- electrical cables, electrical panel
- compost or any other product or service not expressly specified.
Important! The price includes the assembly and commissioning for technological equipment and the climate system only, provided a prior appointment and payment of transportation costs for the team, plus accommodation and meals for 4 people for up to 6 days.
An advance of 60% is required when placing an order.