Snow loads and clearing snow from greenhouses and polytunnels

Polytunnels covered with snow

How much wet snow weighs on a polytunnel, why uneven drifts are dangerous, what to check on the structure and how to clear snow without tearing the film.

Winter brings frost, wind and snow that can fall for days. For an owner of a greenhouse or polytunnel, snow is the biggest test for the structure. Here is how to prepare.

How much snow weighs

The water content of snow varies a great deal. “Dry” snow falls at very low temperatures, but most often we get “wet” snow, which falls at around 0 °C or near large bodies of water. Wet snow is up to four times heavier: 8–10 cm of wet snow means about 25 kg per square metre. A 9 × 30 m polytunnel (270 m²) then has to carry around 6.75 tonnes of snow.

How much the structure can take

The load a greenhouse can carry depends on the snowfall expected in your area, the roof pitch, the bracing and other reinforcement, and whether the greenhouse is heated while it snows. Check the greenhouse documentation for the permitted snow load.

The most dangerous loads are uneven drifts: the weight is no longer spread evenly over the arches and the structure may fail. Snow can also press on just one side or gable. When polytunnels stand too close together, snow sliding off the roofs piles up between them and pushes the sides inwards. Leave at least 2–3 m between structures. If snow between polytunnels cannot be cleared at all, cut the film: the snow falls inside and you lose the film, perhaps the crop, but you save the structure.

Check the structure

  • Before heavy snow and at every routine check, inspect bolts, screws and clamps: all present and tight. Missing ones weaken the structure, especially at the bottom, where it gives way first.
  • If the structure has no bracing or reinforcement, ask the manufacturer for it. As a temporary fix, you can stand vertical props from the ground to the highest points of the arches along the whole polytunnel, or fit diagonal braces under the arches.
  • On welded structures, check all welds, including on tie bars and reinforcements, and repair any broken weld or damaged metal straight away.

Even with reinforcement, snow on the roof and sides must be cleared.

Polytunnels with inflated double film

Double film reduces heat loss, but it also slows snow melt, because the air cushion insulates. You can lower the pressure between the layers so they touch and heat reaches the snow more easily. Beware of strong wind, though: uninflated film flaps, can loosen or tear at the fixings and can even be ripped off.

How to clear the snow

  • With a snow rake – without puncturing the film; snow pulled down the sides must be removed straight away.
  • With a knotted rope pulled over the roof – the risk of damaging the film is very small. Use braided nylon rope with fine knots; polypropylene or twisted nylon rope is rough and shortens the film's life.
  • In heated greenhouses with thermal screens, open the screens: the heat rises under the roof and melts the snow on contact. In very heavy snowfall a compact layer may still form, which slides off when its base melts.

Make a plan before winter, check the snow on and around the structure often and clear it as soon as you can. More tips in our article on storm and snow damage.

Reference (in English): W. Garrett Owen, in HortiDaily.

Planning a greenhouse or a polytunnel?

Our team can help you choose the structure, the film and the equipment for what you want to grow.

Back to the blog

Chat on WhatsApp